Add to Cart
Add to Lightbox
Download
The concrete bridge was completed over 100 years ago. The procedure to produce the relief in still wet concrete was named after the assistant engineer that worked on the bridge, Henry Quimby. (Bas Slabbers/for NewsWorks)
- Filename
- BS0216 2.jpg
- Copyright
- copyright@basslabbers.com
- Image Size
- 1204x800 / 320.2KB
- Contained in galleries
- Property & Retail Development in Philadelphia - Editorial Stock Photo Archive, ARCHIVE - U.S. Infrastructure
